Installation and Parts ManualLectroCount LCRwww.lcmeter.comInstallation: EM100-20
10Valve InstallationFuel Oil Trucks Preset/Security Valve InstallationInstalling an LCR on a refined fuel truck typically requiresthe removal of the s
11Wiring the LCRGeneralOnce the LCR, and optional equipment such as control valve and ETVC kit have been installed in accordance withinstructions supp
12Wiring the LCRWiring of Valve Solenoids to LCRWhen wiring valve solenoids to the LCR, the wires mayhave to be spliced in order to reach the appropri
13Wiring the LCRInstalling factory-supplied printer Power cable, LCRPower Cable, and printer data cableYour LCR includes an electrical black-sheathed1
14Wiring the LCRWiring Customer-Furnished Remote START/StopSwitch to LCR (Optional)A user-supplied momentary remote START/STOP Switchcan be connected
15Wiring the LCRInstalling a Valve with 110VAC SolenoidsThis step applies only to configurations that will be usinga two-stage valve with 110VAC solen
16Guidelines for Environmental SealingThe LCR contains a printed circuit board with sensitiveelectronic components that can be damaged by thepresence
17After the LCR has been installed, check to make surethat it will power up correctly. The back light on the LCRdisplay should go on when the truck’s
18Wiring Schematic
19Wiring Schematic
2Table of ContentsPublication Updates and TranslationsThe most current English versions of all Liquid Controls publications are available on our websi
20Wire ConnectionTablesThis appendix provides a tabular description of the wiring connections made to each LCR-II terminal block. It shouldbe referen
21Wire Connection TablesRTD TEMP. PROBE CONNECTION (J14)VALVE SOLENOID CONNECTION (J13)NOTE: Pull-down resistors of 300 Ω needs to beconnected between
22Illustrated Parts Breakdown
23Illustrated Parts Breakdown
© 2007 Liquid ControlsPub. No. 500049(05/07)A Unit of IDEX Corporation105 Albrecht DriveLake Bluff, IL 60044-22421.800.458.5262 • 847.295.1050Fax: 8
3GeneralThe LectroCount LCR is an electronic meter register thatcan be used to calibrate a flow meter, control a securityvalve, output delivery inform
4Installation OverviewMeters with LCR (factory installed)In many instances, the LCR will be factory installed on aLiquid Controls meter, along with a
5Power Requirements+9 to 28 Volts DC @ less than 3 Amps for entire registerincluding solenoid valves. The system can operate witheither a positive or
6Regulatory Specifications!!!!! IMPOR IMPOR IMPOR IMPOR IMPORTTTTTANTANTANTANTANTFor North American Installations, the installation must be fully in a
7Parts RequirementsLiquid Controls Supplied ComponentsLCR register, and LC-supplied options including; printer,Lap Pad, control valve or solenoid, ETV
8LCR Register MountingThe LCR register is usually mounted on the liquid flowmeter, though for fixed installations it can be mountedup to 1000 wire fee
9Valve InstallationGeneralThe LCR can provide security valve and preset controlcapabilities via the Solenoid 1 and 2 outputs. Single-stage and two-st
Commentaires sur ces manuels